Bonnie Brae

BONNIE BRAE PHASE 3 WIDENING AND RECONSTRUCTION

NTP Date: 10/16/2023
Final Completion Date: 4/2/2026

Project Description

Sundt is partnering with the City of Denton to complete the widening and reconstruction of Bonnie Brae from a two-lane rural roadway to a four-lane divided urban street with minimal impact on the neighborhood and University of North Texas (UNT) facilities, and within the required time frame and ahead of the UNT football home opener on August 30, 2025. This will provide full capacity on Bonnie Brae. The project consists of two miles of paving, concrete pavement, asphalt Paving, 16,500-SY concrete trail and sidewalk, 9,900 feet of concrete storm pipe, 47 curb inlets, 4,700 foot 12 inch water line, 5,800 feet of 21 and 24 inch sanitary sewer line, 22 sanitary sewer manholes, signal lights at Roselawn Drive & FM 1515 & IH-35E, Contra Flow signals, 55 Street Lights, 28,000 feet pavement markings, 100 small signs, DME Underground electrical communications lines.

Project Contacts

Yunwei Tong
Project Manager
210.850.5645

Ron Schenk
Project Superintendent
214.433.2222

Chris Hernandez
Project Engineer
469.644.1243

Where we're working

1: Road Closure with Detour

Location: Lorem ipsum dolor sit.
Dates: 10/25 – 10/31
Closure Type: Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus.

2: Lane Restriction

Location: Lorem ipsum dolor sit.
Dates: 10/25 – 10/31
Closure Type: Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus.

JOB PROGRESS

FUN FACT

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.