NEIGHBORHOOD 1b IMPROVEMENTS
NTP Date: 04/17/2025
SUbstantial Completion Date: TBD
Project Description
The project consists of full depth reconstruction of 22 street segments within the NBHD 1 B project area. This includes road reconstruction with subgrade stabilization, asphalt paving, concrete curb and gutter, and driveway replacements (limited to driveways that are within the existing right-of-way). The project aims to limit future construction disruptions by replacing aging water, sanitary sewer lines, select stormwater infrastructure, limited sidewalk improvements and street lighting.
The principal items of work are as follows:
- Full depth street reconstruction with subgrade stabilization.
- Asphalt Paving
- Concrete Curb and Gutter replacement along with replacement of driveways.
- Waterline Replacement including service connections.
- Sanitary Sewer Line Replacement including service connections.
- Storm Sewer infrastructure replacement where identified.
- Concrete sidewalk improvements.

Project Contacts
Ronald Schenk Project Superintendent 214.433.2222
Holly Horsak
Area Manager
602.350.5251
Jeremiah Beiter
Sr. Project Manager
469.724.6338
Where we're working

1. ROAD CLOSURE
Location: Juno, Huisache
Dates: 4/10
Closure Type: local traffic only
2. ROAD CLOSURE
Dates: 4/11
3. ROAD CLOSURE
Dates: 4/14
JOB PROGRESS






























FUN FACT
- Sundt was founded in 1890 by Mauritz Martinsen Sundt, a Norwegian ship carpenter who immigrated to the United States as a teenager.