Neighborhood 1B

NEIGHBORHOOD 1b IMPROVEMENTS

NTP Date: 04/17/2025
SUbstantial Completion Date: 9/26
Final completion date: 10/26

Project Description

The project consists of full depth reconstruction of 22 street segments within the NBHD 1 B project area. This includes road reconstruction with subgrade stabilization, asphalt paving, concrete curb and gutter, and driveway replacements (limited to driveways that are within the existing right-of-way). The project aims to limit future construction disruptions by replacing aging water, sanitary sewer lines, select stormwater infrastructure, limited sidewalk improvements and street lighting.

The principal items of work are as follows:
  • Full depth street reconstruction with subgrade stabilization.
  • Asphalt Paving
  • Concrete Curb and Gutter replacement along with replacement of driveways.
  • Waterline Replacement including service connections.
  • Sanitary Sewer Line Replacement including service connections.
  • Storm Sewer infrastructure replacement where identified.
  • Concrete sidewalk improvements.

Project Contacts

Jackie Barns 
Project Manager
972.561.8232

Jason Dyson 
Superintendent
469.559.9441

Holly Horsak
Area Manager
602.350.5251

Where we're working

1. ROAD CLOSURE
 
Location: Northridge St
Dates: 4/14 to 3/24/26
Closure Type: local traffic only 
2. ROAD CLOSURE
 
Location: Selene Dr
Dates: 6/4 to 6/30/26
Closure Type: local traffic only
3. ROAD CLOSURE
 
Location: Pershing Dr
Dates: 5/8 to 4/26/26
Closure Type: local traffic only
4. ROAD CLOSURE
 
Location: Wellington Dr
Dates: 2/16/26 to 5/29/26
Closure Type: local traffic only
5. ROAD CLOSURE
 
Location: Sheraton Rd
Dates: 7/29/25 to 3/28/26
Closure Type: local traffic only
6. ROAD CLOSURE
 
Location: Apollo Dr
Dates: 9/25/25 to 4/30/26
Closure Type: local traffic only
7. ROAD CLOSURE
 
Location: Titan Tr
Dates: 8/25/25 to 6/09/26
Closure Type: local traffic only
8. ROAD CLOSURE
 
Location: Huntington Dr
Dates: 10/20/25 to 3/28/26
Closure Type: local traffic only
9. ROAD CLOSURE
 
Location: Buckingham Dr
Dates: 1/23/26 to 7/23/26
Closure Type: local traffic only
10. ROAD CLOSURE 
 
Location: Redstone Rd
Dates: 2/23/26 to 9/26/26
Closure Type: local traffic only
11. ROAD CLOSURE
 
Location: Neptune Dr
Dates: 1/09/26 to 5/30/26
Closure Type: local traffic only
12. ROAD CLOSURE
 
Location: Donna Rd
Dates: 11/07/25 to 5/23/26
Closure Type: local traffic only
13. ROAD CLOSURE
 
Location: Jupiter Dr
Dates: 4/27/25 to 8/21/26
Closure Type: local traffic only
14. ROAD CLOSURE
 
Location: Del Dr
Dates: 3/16/26 to 8/21/26
Closure Type: local traffic only

JOB PROGRESS

FUN FACT

The Denton “Wall of Sound” Fact

If every musician in Denton’s famous music scene lined up their Standard Fender Stratocasters end-to-end to match the 31,479 linear feet of pipe Sundt is installing, you would need exactly 9,685 guitars.